Our network

Bridge District Road Closure – 6/2/12 at 7AM through 6/5/12 at 7AM | Transportation

Title (Max 100 Characters)

Bridge District Road Closure – 6/2/12 at 7AM through 6/5/12 at 7AM
Transportation
Bridge District Road Closure – 6/2/12 at 7AM through 6/5/12 at 7AM

Teichert will be closing Riverfront Street starting on Saturday morning, 6/2/12 at 7AM, through Tuesday morning, 6/5/12 at 7AM.  This will allow them to make repairs to the granite crosswalks on Riverfront Street at the intersection with Bridge, Grand, Market and State Streets and allow the repairs to cure. 

See the attached traffic control plan for more details.  During the closure traffic will be able to travel through the area along Fifth Street, Tower Bridge Gateway, Ballpark Drive, and a small portion of Riverfront Street between Ballpark Drive and Tower Bridge Gateway.  It is critical that we keep vehicles off of Riverfront Street between Bridge Street and Ballpark Drive to allow the repairs to cure.

Traffic Control Plan

Transportation

Top West Sacramento Stories

Upcoming Events near West Sacramento

West Sacramento Deals

Do you have a story to tell? Become a community blogger!

Community Sponsors